The Reality of Rehab

Over two months has passed since the last post in which I promised this post would be showing you the pretty stuff.  Sadly, I can't deliver on that promise. The rehab clock sometimes runs counter clockwise.  Here us what I can show you. The massive hood has been installed in the kitchen and the ceiling grid is in place. Tile has been laid in the kitchen and... in the front service area. The floors behind the bar and the kitchenette on the second floor have been waterproofed and... the tile has been installed. The tile work that was started in the bathrooms had to be put on hold because of some plumbing problems.  Those "little" problems persisted resulting in the removal of parts of the drywall to resolve the problem.  But the ol' rehab clock is running again, although, not always keeping perfect time. The second floor ceiling in this shot is ready and waiting for ceiling panels. .Getting started on those panels. This is a la