Because of the Labor Day holiday, this is the beginning of a four day work week. There is much to be done so let's see what happens day by day.
We didn't get off to a great start. This beauty of a tub spout was not compatible with the rough-in. It had to be packaged up and returned.
Another selection has been made and is on order. The guys put this on hold and moved on to the next thing on the list.
The floor tile was down and just needed grout so that came next,
The walls needed that final touch up and the baseboards are cut and in place.
This opening now has...
The vanity area is progressing too.
Vanity, sink and faucets, but not running water, yet.
Switches and covers are also in place.
This light fixture was a bit of a pistol to install but Dan persisted. Note the exhaust fan and light over the tub/shower are also in place.
The backsplash tile required some math, measuring and masterful cutting to prepare for installation.
Almost there.
And here you have it. Not grouted yet but you can't tell from this shot.
Still debating whether to use the drawer pulls that came with the vanity. I'm waiting for a few more things to be installed before I decide if chrome is the way to go.
The mirrors went up but the light above them gave us some trouble. Still waiting to resolve that.
I found this dental cabinet at one of my favorite antique shops. I'm hoping to use it...
here! Right now it's back in the garage undergoing a makeover. More on that in another post.
We didn't get off to a great start. This beauty of a tub spout was not compatible with the rough-in. It had to be packaged up and returned.
Another selection has been made and is on order. The guys put this on hold and moved on to the next thing on the list.
The floor tile was down and just needed grout so that came next,
The walls needed that final touch up and the baseboards are cut and in place.
This opening now has...
a stainless steel niche for soap and shampoo (still sporting the protective cover.) And,yes, a functioning toilet,
The vanity area is progressing too.
Vanity, sink and faucets, but not running water, yet.
Switches and covers are also in place.
This light fixture was a bit of a pistol to install but Dan persisted. Note the exhaust fan and light over the tub/shower are also in place.
The backsplash tile required some math, measuring and masterful cutting to prepare for installation.
Almost there.
Still debating whether to use the drawer pulls that came with the vanity. I'm waiting for a few more things to be installed before I decide if chrome is the way to go.
The mirrors went up but the light above them gave us some trouble. Still waiting to resolve that.
I found this dental cabinet at one of my favorite antique shops. I'm hoping to use it...
here! Right now it's back in the garage undergoing a makeover. More on that in another post.